Industrial parkNot verified
Khorgos China–Kazakhstan Industrial Park (China-Kazakhstan International Industrial City)
Zhetysu · in Khorgos SEZ
Machine translation; may contain errors.

- Region
- Zhetysu Region
- Area
- 10 000 000 m²
- Type
- Industrial park
- Updated
- 2026-10-07
Conditions
- 1,000 ha planned
- Phase 1: 200 ha
- Manufacturing/logistics
- Capacity cooperation
About the project
Located within SEZ "Khorgos – Eastern Gate", planned at 1,000 hectares with a first phase of 200 hectares; a manufacturing and logistics park intended to receive relocated Chinese production capacity.
According to Interfax in October 2023, the park is being developed by China-Kazakhstan International Industrial City LLP, with a project value of about KZT 330 billion (about USD 692 million). It is planned at 1,000 hectares, with infrastructure such as water, power and roads being built on the first 200 hectares; focus areas are manufacturing and logistics.
This information is from a 2023 report; current progress and investment terms must be verified with the developer.
Verification · Not verifiedDetails come from the project owner or public reports; the platform has not checked them yet.
interfax.com/newsroom/top-stories/95350/
What the levels mean
- Not verified:Details come from the project owner or public reports; the platform has not checked them yet.
- Company checked:The owner’s or operator’s registration (BIN, status) was found in the official register, with no sign of bankruptcy or sanctions.
- Documents checked:Title, planning or establishment documents were checked against the official register or published text.
- Site visited:Platform staff or a partner visited the site, took dated and geotagged photos or video, and met the person in charge.
- Officially confirmed:The regional government, Kazakh Invest or the SEZ operator confirmed it in writing.
interfax.com/newsroom/top-stories/95350/