In-Depth Analysis of Kazakhstan Geological Study Licenses: Scope of Authority, Application Procedures, and Compliance Risks
According to records on e-qazyna, the unified subsoil management platform of the Ministry of Industry and Construction of the Republic of Kazakhstan (queried as of November 18), Kazakhmys was issued a geological study license on November 16, 2026 (№602-GINL, valid until November 16, 2029), link e-qazyna License Details Page (№602-GINL). For Chinese geological exploration and mining enterprises planning early-stage geological surveys and prospecting screening in Kazakhstan, this license serves as a basic geological work permit that does not confer exploration or extraction rights. Thoroughly understanding its statutory scope of authority, operational restrictions, and compliance boundaries is the primary prerequisite for project implementation.
Q: What are the statutory rights granted by a geological study license? What can and cannot be done under it?
Under Article 84, Paragraph 1 of the Republic of Kazakhstan's Code "On Subsoil and Subsoil Use", the licensee has the right to use the subsoil for a three-year period to conduct regional geological surveying and/or geophysical work, as well as prospecting and evaluation work for groundwater Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). This right constitutes a regional, preliminary investigatory right and does not grant the licensee an exclusive right (исключительное право) over the geological study block(s) involved, unless a decision of the Government of the Republic of Kazakhstan stipulates otherwise.
In terms of the boundaries of authority, this license is strictly distinguished from exploration licenses and extraction licenses for solid minerals or hydrocarbons. Licensees may only conduct basic geological surveys within the approved blocks; they cannot claim exclusive exploration rights or preferential extraction rights over the mineral resources of the block, nor may they exceed the statutorily permitted types of operations to undertake heavy mining construction or extraction activities. For enterprises seeking long-term exclusivity protections over mining rights, the specific configuration of rights is subject to case-by-case replies from the competent authority.
Q: How large an area can a geological study license cover? How are spatial overlaps with existing mineral rights handled?
Regarding territorial scope, Article 85, Paragraph 1 of the Code "On Subsoil and Subsoil Use" explicitly provides that a geological study license may be issued throughout the entire territory of the Republic of Kazakhstan Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). The law does not set a single maximum area limit under Article 85 of the Code for the geological study block(s) (блок/блоки) applied for under this type of license, but the applicant must clearly list in the application the specific block code or codes that constitute the geological study territory.
Regarding spatial overlap with mineral rights, Article 85, Paragraph 2 establishes a strict rights protection mechanism: for subsoil blocks already granted to another party for mineral exploration and/or extraction, the holder of a geological study license has no right to carry out geological study operations within that block without the consent of that subsoil user, except in the case of conducting airborne geophysical surveys (аэрогеофизические исследования) Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). Therefore, if an enterprise plans to carry out ground geophysics, geological mapping, or surface sampling, it is advised to conduct prior checks against existing mineral rights and legally obtain consent from that subsoil user.
Q: What materials and information are required to apply for a geological study license? What are the language requirements?
An application for a geological study license must be submitted in the prescribed written format to the competent authority for subsoil study pursuant to Article 86 of the Code "On Subsoil and Subsoil Use" Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). The application package includes the following primary contents and attachments:
- Basic applicant information: Natural persons must provide full name, address of residence, citizenship, and identity document details; legal entities must provide name, legal address, state registration details of the legal entity (an extract from the trade register or other legalized (легализованный) document certifying that the applicant is incorporated as a legal entity under foreign law), and information regarding executive officers.
- Block coordinates information: Clear indication of the block(s) (блок/блоки) that constitute the territory of geological study.
- Title and authorization documents: Copies of supporting documents for the above basic information, as well as valid powers of attorney where an application is submitted by an agent.
- Project design documents: A geological study plan and/or a design project for groundwater prospecting and evaluation compiled and approved by the applicant in accordance with Article 88 of the Code.
Regarding language requirements, the application and attached documents must be submitted in Kazakh and Russian; documents prepared in a foreign language must be accompanied by translations into Kazakh and Russian with their accuracy certified by a notary public.
Q: How does the competent authority review an application? Under what circumstances can it refuse to issue a license?
The review mechanism of the competent authority is subject to clear statutory discretionary constraints. Article 87, Paragraph 1 of the Code "On Subsoil and Subsoil Use" specifies that the competent authority for subsoil study shall review the application within ten business days from the date of receipt and make a decision to issue or refuse to issue the license Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet).
Statutory grounds for refusal are strictly limited to instances where the application or its accompanying documents do not satisfy the formal and substantive requirements set forth in Article 86 of the Code. By law, the refusal decision issued by the competent authority must state specific reasons (быть мотивирован). If the applicant disputes the refusal decision, an administrative complaint or judicial claim may be filed in accordance with the legislation of the Republic of Kazakhstan no later than ten business days from the date of receiving the notification Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). At the same time, refusal does not deprive the applicant of the right to resubmit the application after amending the materials. The specific operational rules for application and consideration are established by the competent authority.
Q: What project documentation must be prepared prior to operations? How are subsequent modifications handled if work scopes change?
Pursuant to Article 88 of the Code "On Subsoil and Subsoil Use", project documentation for conducting geological study operations comprises two categories: a "geological study plan" for geological surveying and/or geophysical operations, and a "design project for groundwater prospecting and evaluation" for prospecting and assessing groundwater deposits and sections Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). Both types of documents are compiled and approved independently by the subsoil user. The geological study plan must outline the types of work, methods, estimated volumes, operational territory, and execution timelines over the three-year period. The groundwater project must list the work methods, well quantities and parameters, timelines, as well as environmental remediation/restoration measures and cost estimates.
Adjustments to project contents must comply with statutory review workflows: if types of work, methods, or volumes change, the enterprise must amend the project documentation and deliver it to the competent authority. If environmental legislation requires that relevant modifications obtain an environmental permit or a positive conclusion of state ecological expertise, the enterprise must obtain such permit or positive conclusion prior to submitting the amended project documents to the competent authority. Modifications to a groundwater prospecting and evaluation project made after license issuance must be submitted to the competent authority for coordination, and the competent authority completes its review within twenty business days from the date of receipt of the modified project Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). If the project does not conform to project preparation guidelines, the competent authority is entitled to refuse coordination; the enterprise may reapply after revisions or appeal in accordance with the law.
Rules related to this news
Q: What are the compliance requirements and absolute red lines for conducting field operations within the study block?
When carrying out operations within the block, the licensee must strictly observe ecological safety and industrial safety standards, maintain complete record-keeping for all geological exploration operations, and ensure the authenticity and integrity of geological information. At the same time, Article 89, Paragraph 4 of the Code "On Subsoil and Subsoil Use" establishes a strict negative list of prohibited operations Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet):
- The construction of capital structures (капитальные сооружения) is prohibited;
- Continuous stockpiling and storage of explosives are prohibited;
- Excavation of test trenches (канавы), test pits (шурфы), trenches (траншеи), and other types of mining excavations is prohibited;
- Conducting stripping operations (вскрышные работы) is prohibited.
Regarding drilling authority, the law enforces strict purpose controls: the licensee is only entitled to conduct drilling activities directly related to geophysical studies and groundwater prospecting and evaluation work; only in exceptional cases authorized by a specific decision of the Government of the Republic of Kazakhstan is the licensee entitled to drill parametric wells (параметрические скважины) within the block. Furthermore, discovered groundwater reserves must pass state appraisal by the State Subsoil Reserves Commission before being registered on record; extraction and water intake are governed by the water legislation of the Republic of Kazakhstan.
Q: What reporting obligations must licensees fulfill during the operational period and after license termination?
Pursuant to Article 90 of the Code "On Subsoil and Subsoil Use", licensees bear statutory obligations to submit periodic geological reports and final geological reports Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet):
- Annual periodic reports: Submitted to the competent authority before April 30 of each year for the preceding calendar year; if the operational period is an incomplete calendar year, reports are submitted for the actual period of use.
- End-of-term reports: The report for the final incomplete calendar year of the subsoil use period must be submitted no later than two months after the expiration of that period.
- Final geological report: Following the termination of the license, the former licensee must submit a final geological report on the results of the geological study to the competent authority no later than three months from the date of termination.
All reports must be based on primary geological data, comprehensively covering results of scientific geological research, tests, experiments, groundwater hydrogeological drilling, and the collection and assay analysis of soil, surface rock, and mineral specimens, and must be submitted using standardized forms prescribed by the competent authority.
Q: Who owns the acquired geological information? Can it be freely used and transferred?
Article 91, Paragraph 1 of the Code "On Subsoil and Subsoil Use" explicitly establishes an enterprise's disposition rights over exploration outcomes: the holder of a geological study license has the right to freely dispose of (распоряжаться) geological information obtained as a result of geological study activities Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). This means that within the framework of the Code, enterprises possess autonomy regarding the use, transfer, or commercial exploitation of raw data, maps, and research reports.
However, this right is accompanied by statutory rules on information handover and declassification:
- Free handover obligation: Geological information obtained by the licensee from geological study must be transferred to the competent authority for subsoil study for use free of charge within one month from the expiration date of the license.
- Confidentiality protection period: After receiving the geological information transferred by the enterprise, the competent authority must maintain its confidential status and may publicly disclose such geological information pursuant to law only after five years from the date of its acquisition (срок конфиденциальности) Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet). This timeframe provides enterprises with a statutory window of early data advantage.
Q: Under what circumstances will a license be revoked by the competent authority? What are the procedures and avenues for relief?
Under Article 92, Paragraph 1 of the Code "On Subsoil and Subsoil Use", the competent authority may revoke a geological study license according to law upon the occurrence of either of the following two statutory circumstances Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet):
1. Violation of the operational red lines under Article 89, Paragraph 4 of the Code (unauthorized construction of capital structures, storage of explosives, carrying out stripping, excavating trench/pit/tunnel workings, or drilling beyond the permitted scope);
2. Failure to pay the signature bonus (подписной бонус) for the issuance of the geological study license in the amount and within the timelines established by the tax legislation of the Republic of Kazakhstan.
The revocation procedure involves clear timeframes and rights-protection mechanisms: upon detecting a violation, the competent authority must notify the enterprise in writing, and the enterprise must eliminate the violation and submit written evidence of rectification within twenty business days from the date of receiving the notice. If the violation is not cured within the time limit, the competent authority will issue a formal revocation notice. The license ceases to have effect ten calendar days after the enterprise receives the revocation notice. The enterprise must immediately cease operations and clear the site on the date of receiving the revocation notice; if the enterprise initiates judicial proceedings in court, the ten-calendar-day termination period is suspended by law until the entry into force of the court's judicial act.
| Operational Stage | Statutory Conditions & Key Requirements | Statutory Deadlines & Milestones |
|---|---|---|
| License Validity Period | For geological surveying, geophysics, and groundwater prospecting/evaluation; non-exclusive | Three years |
| Application Review & Decision | Competent authority conducts formal and compliance review under statutory criteria | Within ten business days from receipt of application |
| Legal Remedies for Application Refusal | Filing an administrative complaint or lawsuit against a license refusal decision | No later than ten business days from receipt of notification |
| Review of Groundwater Project Amendments | Amendments to groundwater project must be coordinated with the competent authority | Within twenty business days from submission of amended project |
| Annual Periodic Geological Report | Summarizes scientific research, sampling, and geological work results from preceding year | Before April 30 of each year |
| End-of-Term Periodic Report | Reports actual operations for the final incomplete calendar year of use period | No later than two months after period expiration |
| Final Geological Report | Comprehensively aggregates geological study outcomes for submission to competent authority | No later than three months from license termination date |
| Free Handover of Geological Information | Transfers acquired research data and materials to competent authority for use | Within one month from license expiration date |
| Statutory Confidentiality of Geological Information | Competent authority maintains confidentiality; publicly disclosed upon expiration | Five years from acquisition by competent authority |
| Breach Rectification Defense Period | Rectify and reply with supporting evidence after receiving written notice of violation | Within twenty business days from receipt of notice |
| Revocation Notice Effective Date | Revocation notice issued if uncured; litigation suspends expiry until judgment takes effect | Expires ten calendar days after receipt of revocation notice |
Source: Code "On Subsoil and Subsoil Use" Articles 84–92 (adilet)
List of Sources
政策能查出处,落地找人对接,详情问 tumah.kz
Policies can be traced to their sources, implementation contacts can be arranged — ask tumah.kz for details
Key facts
- Kazakhmys was issued license №602-GINL on November 16, 2026, valid until November 16, 2029.
- The Kazakhstan geological research license is valid for three years.
- The license holder may conduct regional geological mapping, geophysical operations, and groundwater reconnaissance and evaluation.
- The geological research license does not include rights to explore, extract, conduct stripping, or construct mine workings.
- The competent authority must complete its review within ten business days from the date of receipt of the application.
- The license holder must transfer geological information to the competent authority free of charge within one month after expiry of the license, and the competent authority must keep it confidential for five years.
FAQ
What activities may be conducted under a Kazakhstan geological research license?
The license holder may conduct regional geological mapping, geophysical operations, and groundwater reconnaissance and evaluation within a three-year period. The license does not include rights to explore, extract, conduct stripping, or construct mine workings, and is generally non-exclusive with respect to a block, unless the Government of the Republic of Kazakhstan decides otherwise.
What are the application materials and review period?
The application must include a written application, applicant information, block identifiers, title or authorization documents, and the project design documentation. The application and attachments must be in Kazakh and Russian. Foreign-language documents must be accompanied by notarized and certified Kazakh-Russian bilingual translations. The competent authority must complete its review within ten business days from the date of receipt of the application.
What area may the license cover, and how is overlap with existing mineral rights handled?
The license may be issued throughout the territory of the Republic of Kazakhstan, and one or more specific block identifiers must be specified at the time of application. Geological research may not be conducted in blocks already granted to others for mineral exploration or extraction without the consent of the existing holder of subsoil use rights, except for airborne geophysical surveys.
Can geological research information be used and transferred, and what handover obligations does the license holder have?
The license holder may freely use, transfer, or commercially develop the geological information obtained. Within one month after expiry of the license, the license holder must transfer the information to the competent authority free of charge, and the competent authority must keep it confidential for five years from the date of receipt.
Which violations may result in revocation of the license?
Violation of operational red lines or failure to pay the signature bonus in the amount and within the deadline prescribed by the tax law may result in revocation of the license in accordance with law. Within twenty business days after receiving notice of a violation, the license holder must rectify the violation and submit written evidence thereof. If the violation is not rectified within that period, the license holder will receive notice of revocation and must immediately cease operations and vacate the site.