For Chinese-funded enterprises planning underground oil and gas storage, deep-well industrial waste injection, artificial groundwater recharge, or mining solid waste storage in Kazakhstan, clarifying subsoil space rights is a prerequisite for project implementation. Chapter 33 of the Code of the Republic of Kazakhstan "On Subsoil and Subsoil Use" (hereinafter "Subsoil Code") establishes a dedicated licensing regime with stringent environmental and safety qualification standards. Integrating Tumah's previously published Solid Minerals Mining License Compliance Guide and Technogenic Mineral Formations: Ownership and Transfer Q&A, this guide focuses on Articles 249–262 of the Subsoil Code to outline statutory purposes, prohibited areas, application and review procedures, project design, liquidation security, and license revocation and relief mechanisms.
Q: What is a Kazakhstan subsoil space use license? Which specific statutory operations does it cover?
Under Article 249 of the Subsoil Code, a subsoil space use license grants exclusive rights to conduct a single statutory category of operations within a designated plot Article 249 of the Code "On Subsoil and Subsoil Use" (adilet):
- Placement and operation of underground storage facilities for oil, gas, gas processing products, and petroleum products at depths below 5 meters from the surface;
- Placement and/or operation of underground facilities for storage or burial of solid and liquid waste, hazardous and toxic substances, or discharge (injection) of sewage, industrial, and technological water into the subsoil;
- Water injection into the subsoil for artificial replenishment of groundwater reserves, including construction and/or operation of underground facilities created for this purpose;
- Placement and/or operation of facilities for placement of technogenic mineral formations (TMO) from mining and/or processing industries.
This license is independent of mineral exploration and production licenses and strictly restricted to the approved exclusive operations within the designated plot.
Q: In which areas can enterprises apply for subsoil space use? Which areas are established by law as prohibited zones?
Pursuant to Article 250, Paragraph 1 of the Subsoil Code, licenses are granted only on plots without mineral deposits or containing only minor resources not classified as commonly occurring minerals Article 250, Paragraph 1 of the Code "On Subsoil and Subsoil Use" (adilet).
Under Paragraph 2 of the same Article, issuance is strictly prohibited in:
- Statutory cases under Article 25, Paragraph 2 of the Code;
- Active plots used by others for mineral exploration, production, or subsoil space use;
- Plots undergoing liquidation of exploration or production consequences;
- Plots with identified mineral resources or prospecting potential (excluding commonly occurring minerals);
- Areas of drinking groundwater distribution Article 250, Paragraph 2 of the Code "On Subsoil and Subsoil Use" (adilet).
Enterprises must conduct preliminary geological background investigations to rule out drinking water sources and prospecting potential.
Q: What materials and technical documents must be prepared when applying for a subsoil space use license? What are the requirements for the submission format?
According to Article 251 of the Subsoil Code, an applicant must submit a prescribed application to the competent authority for subsoil study, specifying applicant identity (foreign entities submit legalized commercial register excerpts), plot boundaries/spatial coordinates, duration, and statutory purpose Article 251, Paragraphs 1-2 of the Code "On Subsoil and Subsoil Use" (adilet).
Core accompanying documents include:
- Identity qualification documents and statutory power of attorney (if represented by an agent);
- A prescribed geological report detailing underground engineering facility characteristics, isolating/sealing properties, rock types, depth and effective reservoir thickness, area, porosity coefficient, underlying/overlying aquitard characteristics, groundwater flow velocity, water quality/quantity indicators, and mining engineering, hydrogeological, and environmental conditions;
- For hazardous/toxic substances, waste, or wastewater discharge/injection: product name, generation process, physical characteristics, full chemical composition, toxic component content, fire hazard, explosiveness, solubility, storage compatibility, radionuclides and activity, and transport system details Article 251, Paragraph 3 of the Code "On Subsoil and Subsoil Use" (adilet).
All copies must be notarized. Documents must be in Kazakh and Russian (foreign documents require notarized translations) Article 251, Paragraphs 4-5 of the Code "On Subsoil and Subsoil Use" (adilet). Upon receipt, the authority registers the submission date/time and publishes the applicant's name, coordinates, and timestamp on the unified subsoil use platform the same day.
Q: How does the competent authority review applications? What are the statutory time limits for geological report expert review, development and operation plans, and liquidation plans?
According to Article 252 of the Subsoil Code, the authority initiates review within 3 business days of receipt and arranges state expertise of the geological report via the State Commission for Subsoil Expertise Article 252, Paragraph 1 of the Code "On Subsoil and Subsoil Use" (adilet):
- State expertise of the geological report takes 2 months (extendable up to 6 months for supplementary studies or audit comments); negative conclusions result in direct rejection;
- Upon a favorable conclusion and absence of grounds for refusal, the authority notifies the applicant within 3 business days to draft an exploitation project (проект эксплуатации) and liquidation plan, and complete statutory expertise and coordination;
- The applicant must submit favorable expertise and coordination approvals for both documents within 1 year of notification (liquidation plan preparation/expertise is required only under circumstances specified in Article 260); an extension not exceeding 6 months may be granted for circumstances beyond applicant control;
- The authority issues the license within 5 business days after timely submission of favorable conclusions Article 252, Paragraphs 1-2 of the Code "On Subsoil and Subsoil Use" (adilet).
Following issuance, the regional local executive body grants land use rights under Kazakh land legislation.
Q: How is priority determined when multiple applicants apply for the same plot? What statutory circumstances lead to direct refusal to issue a license?
Pursuant to Article 253, Paragraph 1 of the Subsoil Code, competing applications follow the "first come, first considered" rule Article 253, Paragraph 1 of the Code "On Subsoil and Subsoil Use" (adilet). Subsequent applications are reviewed only 10 business days after a refusal decision on the prior application, or after a final court judgment if litigated. The license is issued to the first compliant applicant; lower-ranked applications are rejected.
Pursuant to Article 254, Paragraph 1, statutory grounds for refusal include:
- Non-compliant application or incomplete documentation;
- Requested plot overlaps an existing lawful subsoil space plot;
- Plot violates Article 250, Paragraph 1 (contains mineral deposits) or Paragraph 2 (prohibited zones);
- National security threat (reasons are not stated);
- Geological or geomechanical unsuitability per geological report expertise;
- Failure to timely submit favorable expertise and coordination for the exploitation project and liquidation plan Article 254, Paragraph 1 of the Code "On Subsoil and Subsoil Use" (adilet).
Rules related to this news
Refusal notices must be delivered in writing. Applicants may appeal within 10 business days; refusal does not bar re-application.
Q: What are the core contents and validity period of a subsoil space use license? How to apply for an extension upon expiration?
Under Articles 255 and 256 of the Subsoil Code, the license specifies statutory tax obligations (signature bonus, land use lease payment), statutory purpose, and revocation grounds for breach Article 255 of the Code "On Subsoil and Subsoil Use" (adilet).
Terms and extension rules:
- Initial validity period shall not exceed 25 consecutive years;
- Extension applications must be submitted no earlier than 1 year prior to expiration; each extension cannot exceed the initial term, with no limit on the number of extensions Article 256, Paragraphs 1-2 of the Code "On Subsoil and Subsoil Use" (adilet);
- If the license expires during extension review, it remains valid; the extended term runs from the day following preceding expiration;
- Late applications, applications submitted earlier than 1 year before expiration, or unrectified breaches bar extension.
| Category | Key Statutory Provisions | Governing Article |
|---|---|---|
| Permitted Uses | Oil and gas storage (depth below five meters), solid and liquid hazardous waste storage/burial, artificial groundwater recharge, facilities for placement of mining and processing solid waste (TMO) | Article 249 |
| Initial Term and Extension | Initial term not exceeding twenty-five consecutive years; single extension not exceeding initial term, unlimited number of extensions; extension application submitted no earlier than one year before expiration | Article 256 |
| Project Design Approvals | Subsoil space exploitation project requires sanitary-epidemiological expertise and industrial safety coordination, and construction operations may commence only after obtaining an environmental permit | Article 257 |
| Commencement and Operational Supervision | Submit operational reports, maintain full-process archival documentation; no restrictions on volume of excavated rock and soil, but excavated materials may only be used for the construction and operation of supporting facilities | Article 258 |
| General Liquidation Consequences | Initiate land reclamation within eight months after license termination, verified and signed via Liquidation Certificate (Акт ликвидации) by an interdepartmental joint commission | Article 259 |
| Special Security for Mining Waste | Approve liquidation working design two years before expiration (or within eight months in case of early termination); performance security may be provided in any form stipulated by the Code, but bank guarantee or pledge of bank deposit must account for no less than 40%, 60%, and 100% of the total amount in stages | Article 260 |
Source: Articles 249–260 of the Code "On Subsoil and Subsoil Use" (adilet).
Q: What project documentation must be prepared to carry out subsoil space development and utilization? What are the daily operational compliance requirements and rock/earth excavation restrictions?
According to Article 257 of the Subsoil Code, the subsoil space exploitation project (проект эксплуатации пространства недр) is the mandatory technical basis for construction Article 257, Paragraph 1 of the Code "On Subsoil and Subsoil Use" (adilet). The project and amendments require sanitary-epidemiological expertise and industrial safety coordination; construction may commence only upon obtaining the environmental permit, positive sanitary-epidemiological expertise, and industrial safety approvals.
Under Article 258, operators must:
- Submit operation reports to the subsoil study authority in the prescribed format and timeframes;
- Maintain full archival records ensuring adequate data for geological study and subsequent development;
- Apply safe technical measures to prevent accidents, accurately meter waste/injected water, and preserve primary/secondary geological and lab data;
- Comply with ecological and industrial safety standards: excavation volume is unrestricted, but excavated rock and soil may only be used to construct and operate supporting surface facilities Article 258, Paragraph 4 of the Code "On Subsoil and Subsoil Use" (adilet).
Q: For special operations such as the storage of mining solid waste (TMO), what stringent provisions does the law establish regarding liquidation plans, dynamic adjustments, and performance security?
For TMO placement from mining/processing, Article 260 of the Subsoil Code imposes enhanced supervisory and security obligations:
- Plan Formulation and Updates: A licensed environmental services entity must draft the liquidation plan, passing industrial safety and state ecological expertises; reassessment and revision of the plan and cost estimates are mandatory at least every 3 years Article 260, Paragraphs 4-5 of the Code "On Subsoil and Subsoil Use" (adilet);
- Liquidation Working Design: Must be approved under construction legislation 2 years before expiration, or within 8 months in cases of early termination;
- Mandatory Phased Security Mechanism: Operations cannot commence without liquidation security covering completed operations and those planned for the next 3 years (covering dismantling, encapsulation, reclamation, river restoration, monitoring, and administrative costs);
- Liquidity Structure Restrictions: Security may use any statutory form under the Code, but bank guarantees (second-tier banks) or bank deposit pledges must constitute ≥40% during the first third of the term, ≥60% during the middle third, and 100% during the final third Article 260, Paragraph 9 of the Code "On Subsoil and Subsoil Use" (adilet).
Under Article 259, Paragraph 2, deposited TMO reverts to subsoil resources upon license termination, requiring liquidation; the former user must commence liquidation within 8 months of termination Article 259, Paragraph 2 of the Code "On Subsoil and Subsoil Use" (adilet).
Q: How does a license holder carry out plot relinquishment? Under what circumstances can a license be revoked by law, and what defenses and relief avenues are available to enterprises?
Voluntary Subsoil Plot Relinquishment Procedure: Under Article 261 of the Subsoil Code, licensees may apply in writing to relinquish all or part of a plot. For partial relinquishment, the retained plot must comply with Article 19, and the relinquished area must complete liquidation and receive a Liquidation Certificate (Акт ликвидации); using relinquished areas is prohibited pending license re-issuance Article 261, Paragraph 3 of the Code "On Subsoil and Subsoil Use" (adilet).
Grounds for License Revocation and Rectification Procedure: Under Article 262, the authority may revoke licenses for breaches of Article 255 conditions or environmental activity bans:
- The authority issues a notice of violation; the enterprise has 3 months to rectify and provide evidence;
- If unrectified, a revocation notice is issued; the license becomes void 3 months after receipt;
- Appeals may be filed within 15 business days of notice; revocation is deferred pending final administrative or judicial resolution Article 262, Paragraph 4 of the Code "On Subsoil and Subsoil Use" (adilet);
- Grounds for Exemption and Exclusions: Force majeure (extraordinary, unavoidable events such as natural disasters or hostilities) exempts revocation; lack of funds, technical means, or market availability of materials/services explicitly do not constitute force majeure Article 262, Paragraph 5 of the Code "On Subsoil and Subsoil Use" (adilet).
Upon revocation, operations must cease immediately and measures must be taken to secure the plot.
List of Sources
- Code «О недрах и недропользовании» (adilet)
- Solid Minerals Mining License Compliance Guide
- Technogenic Mineral Formations: Ownership and Transfer Q&A
政策能查出处,落地找人对接,详情问 tumah.kz
Policies can be traced to their sources, implementation contacts can be arranged — ask tumah.kz for details
Key facts
- Kazakhstan’s Code of Subsoil provides for four types of exclusive subsoil use operations.
- Subsoil use permits in Kazakhstan are independent of permits for mineral exploration and mining.
- In Kazakhstan, the competent authority commences the review of a subsoil use application within three working days.
- The initial validity period of a subsoil use permit in Kazakhstan may not exceed 25 consecutive years.
- In Kazakhstan, subsoil use permits may not be issued in areas containing groundwater intended for drinking water.
- In Kazakhstan, remediation security for the placement of mining solid waste must cover remediation costs for operations already performed and planned operations over the next three years.
FAQ
Which operations are covered by a subsoil use permit in Kazakhstan?
The Code of Subsoil sets out four types of exclusive operations: underground storage of oil, natural gas and other products at depths of more than five metres below the surface; underground disposal of solid and liquid waste and hazardous and toxic substances, together with sewage injection; artificial groundwater recharge; and placement of technogenic mineral formations (TMO) arising from mining and processing. This permit is independent of permits for mineral exploration and mining and may be used only within the approved block.
In which areas is issuance of a subsoil use permit prohibited?
Permits may not be issued in areas containing groundwater intended for drinking water, in blocks already in use by others for mineral exploration and mining or subsoil use, or in blocks where remediation following exploration and mining is underway. Permits also may not be issued for blocks where mineral resources have been identified or where there is potential for mineral prospecting, except in the case of commonly occurring minerals.
How do foreign companies submit applications, and how long do the review and permit issuance process take?
Foreign legal entities must submit an application in the prescribed form, an extract from the business register or equivalent proof of legalization, a geological report and the related technical documents. The documents must be prepared in Kazakh and Russian, and foreign-language documents must be accompanied by notarized and certified translations into both languages. The competent authority must commence the review within three working days after receiving the application. The applicant must submit the subsoil use project and the relevant conformity review findings and coordination documents no later than one year after receiving notice. The competent authority must then issue the permit within five working days.
What are the requirements for the remediation security for TMO placement operations?
Enterprises that store mining and processing solid waste (TMO) must prepare and periodically revise a remediation plan and may not commence operations unless the remediation security is in place. The security must cover the remediation costs of operations already performed and planned operations during the next three years. The proportion of the total security represented by a second-tier bank guarantee or a pledged bank deposit must be no less than 40 per cent, 60 per cent and 100 per cent during the first, second and third thirds of the permit term, respectively.
What are the validity period and extension rules for a subsoil use permit?
The initial permit term may not exceed 25 consecutive years. An application for extension must be submitted no earlier than one year before expiry. Each extension may not exceed the initial permit term, and there is no statutory limit on the number of extensions.