Find my step
MiningPublished November 15, 2026

Compliance Guide for Solid Mineral Mining Licenses in Kazakhstan: Minimum Expenditures, Plan Drafting, Liquidation Security, and License Revocation Rules

A solid mineral mining license in Kazakhstan is issued for up to 25 years. Holders must meet minimum extraction expenditures in MCI with higher rates for ferrous metals, allocate 1% each to training and R&D, approve mining and liquidation plans, and post liquidation security reaching 100%. Expenditures require audit verification. For rent or expenditure defaults, a 3-month cure period applies before license revocation.

Machine translation; may contain errors.

Compliance Guide for Solid Mineral Mining Licenses in Kazakhstan: Minimum Expenditures, Plan Drafting, Liquidation Security, and License Revocation Rules

Illustration: AI-generated, not a real photo.

Information current as of November 16, 2026 (Asia/Almaty); regulatory provisions are subject to the current text on adilet.

Compliance Guide for Solid Mineral Mining Licenses in Kazakhstan: Minimum Expenditures, Plan Drafting, Liquidation Security, and License Revocation Rules

After obtaining a solid mineral mining license (лицензия на добычу ТПИ) in Kazakhstan, mining enterprises enter the operational phase, shifting compliance obligations from exploration to systematic mining expenditures and environmental protection. Annual minimum mining expenditures are calculated in progressive tiers based on plot area as multiples of the Monthly Calculation Index (МРП); substantially higher multiples apply to ferrous metal ores. Concurrently, enterprises must establish compliance mechanisms covering mining plan drafting, environmental and industrial safety reviews, liquidation fund security, local procurement, and periodic reporting.

Question: How is the annual minimum mining expenditure calculated for enterprises holding a solid mineral mining license? What is the difference between common minerals and ferrous metal ores?

The annual minimum mining expenditure is calculated based on the plot area specified in each license, applying the МРП established by the republican budget law in effect on January 1 of the reporting year to each progressive tier Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). If the license and plan provide for extracting ferrous metal ores, higher standards apply:

Mining Plot Area RangeMinimum Expenditure Standard for Common Solid Mineral MiningMinimum Expenditure Standard for Ferrous Metal Ore Mining
Up to five hectares (inclusive)530 times МРП3170 times МРП
Over five hectares up to one hundred hectares (inclusive)1063 times МРП6350 times МРП
Over one hundred hectares up to ten thousand hectares (inclusive)For the portion exceeding one hundred hectares, plus 10 times МРП for each additional hectareFor the portion exceeding one hundred hectares, plus 60 times МРП for each additional hectare
Over ten thousand hectaresFor the portion exceeding ten thousand hectares, plus 120 times МРП for each additional hectareFor the portion exceeding ten thousand hectares, plus 720 times МРП for each additional hectare

(Note: Minimum expenditure standards are derived from Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet))

In the final incomplete year of mining, or upon voluntary relinquishment in any year, minimum expenditures are calculated proportionally for each full month Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). If minimum expenditure requirements are not met, the enterprise must make up the shortfall and report to the competent authority no later than three months into the following year; compensated expenditures cannot be credited toward current-year expenditures Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: Which specific operations and administrative expenses can be included in mining expenditures? Which expenses are explicitly excluded by law?

Statutory mining operation expenditures include:
- Tunneling or stripping work;
- Ventilation provision;
- Drilling and blasting work;
- Mine workings support or maintenance;
- Ground pressure management;
- Ore or rock transportation;
- Dumping and/or ore stockpiling;
- Ore and rock crushing;
- Leaching (heap and/or in-situ leaching);
- Construction of mines, processing facilities, and auxiliary infrastructure on the mining block Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Administrative, managerial, accounting, scientific research, and training expenses may be included, up to a maximum of twenty percent of total declared expenditures in periodic reporting Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Explicitly excluded expenses comprise:
- Setting boundary and geodetic marks on the ground (including land management works);
- Acquiring subsoil use rights, land use rights, or land ownership;
- Scientific research not directly related to the mining block;
- Buyout of land plots, compensation for losses to land owners/users, and land restoration Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Procurements conducted via tenders outside Kazakhstan or in violation of statutory procedures will be excluded by the competent authority from compliance expenditures Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: How long is the term of a mining license? What prerequisite conditions must be met to apply for an extension?

A solid mineral mining license term cannot exceed twenty-five consecutive years Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Upon expiration, it may be extended upon application; each extension cannot exceed the initial term, with no statutory limit on extension counts Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Extension applications must be submitted no earlier than four years before expiration Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). If the license expires during review, it remains valid, and the extension runs from the day following initial expiration Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Extensions will be denied if: requested duration exceeds the initial term; application deadlines are missed; or unresolved defaults exist regarding land use fees (rent) or minimum expenditures prior to application Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: During the mining period, what statutory obligations do enterprises have regarding training, scientific research, and procurement of supplies?

From the second year of license validity, enterprises must annually finance:
- Training of Kazakhstani personnel equal to one percent of preceding-year mining expenditures Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet);
- Scientific research, scientific-technical, and/or experimental design works equal to one percent of preceding-year mining expenditures Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).
Contributions exceeding minimum requirements may be credited toward the following year Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Rules related to this news

Procurement methods include open tender, single-source procurement, open reverse auction (electronic bidding), procurement not subject to this rule, and commodity exchanges; goods, works, and services for mining operations must use methods (1) to (3) via the subsoil procurement register or synchronized electronic procurement systems in Kazakhstan Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Domestic producers of works and services receive a conditional twenty percent price discount during bid evaluation Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Subsoil users must submit annual procurement plans (one financial year) and medium/long-term plans (five financial years) Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: What mining plan (план горных работ) must be prepared during the mining stage? What is its approval and modification process?

The design document is the mining plan (план горных работ), drafted and approved independently by the subsoil user Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). It details types, methods, technologies, work scopes, schedules, and engineering solutions Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Operations require an environmental permit and industrial safety authority approval; where surface water protection zones are involved, agreement with the basin water inspection is required Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Changes in methods, technologies, volumes, deadlines, or facilities require amending the plan and submitting it to the competent authority after completing industrial safety reviews, environmental impact assessments, and permit reissuances; construction under amended plans prior to submission is prohibited Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: What is a liquidation plan (план ликвидации)? How is liquidation security (обеспечение ликвидации) provided during the mining period?

The liquidation plan covers mine and infrastructure decommissioning, land reclamation, progressive liquidation, and cost estimations. It must be prepared by a licensed environmental entity, approved by the enterprise, and undergo industrial safety expert review (экспертиза промышленной безопасности) followed by state environmental expert review (государственная экологическая экспертиза) Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Plans and cost calculations must be amended at least every three years from the latest positive review conclusions and updated synchronously with mining plan amendments Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Mining operations are prohibited without providing liquidation security to the competent authority Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). The security must cover total estimated liquidation costs plus costs for works planned over the next three years Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). A bank guarantee or deposit pledge must meet tiered thresholds:
- First third of license duration: at least forty percent of total security;
- Middle third: at least sixty percent;
- Remaining duration: one hundred percent Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: What periodic reports must a licensed enterprise submit? Are there audit and timeline requirements?

Subsoil users must submit six periodic reports:
- Fulfillment of license obligations;
- Procurement of goods, works, and services and in-country value share;
- Direct and indirect ownership control structure;
- Geological report (if conducting exploration within the block);
- Mining of solid minerals;
- Implementation of work program (if retention status is granted) Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Deadlines and audit requirements:
- Procurement reports: quarterly, by the twenty-fifth of the month following the period Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).
- Other annual reports: by April 30 covering the prior calendar year Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).
- Final incomplete year: within two months after license expiration Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).
- Expenditure audit: mining block expenditures in the license fulfillment report must be audited under the Law of the Republic of Kazakhstan "On Auditing Activity" (Закон Республики Казахстан "Об аудиторской деятельности") or disclosed separately in audited financial statements Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: What statutory procedures are required to voluntarily relinquish all or part of a mining plot? What restrictions apply to on-site liquidation?

License holders may request in writing to relinquish all or part of a mining block prior to expiration Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Retained plots must comply with Article 19 delineation rules, and partial relinquishment entails license reissuance Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

The application must include area calculations, turning point coordinates, diagrams, topographic plans, and a mining liquidation acceptance certificate (акт ликвидации) Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Direct return without project execution and liquidation acceptance is prohibited; no mining or use is permitted between liquidation completion and official deduction Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). If the relinquished area had no license works and undisturbed surface/water beds, liquidation is not required; an examination certificate (акт обследования) signed per Article 218(4) serves as the basis for updating the unified state subsoil fund register for subsequent granting Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Question: What are the liability rules and license revocation grounds for violating license obligations, defaulting on fee payments, or failing to meet minimum expenditures?

Violations lead to penalties (неустойка) or license revocation:
- Penalties: failure to meet minimum in-country value shares incurs a thirty percent penalty on the unfulfilled share value; training or research underfunding incurs a one hundred percent penalty on the unfulfilled amount. Paying penalties terminates the corresponding annual principal liability Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).
- Revocation grounds: (1) violating Article 44(1) threatening national security; (2) default on signature bonuses, land use fees (rent), or annual minimum mining expenditures; (3) violating Article 221-8(3) by delaying mine development over two years post-issuance Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

Remediation periods upon written notification: up to one year for national security threats; three months for bonus, rent, or expenditure defaults, verified with confirmation documents Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Unremedied violations result in a written revocation notice, terminating the license three months after receipt Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Subsoil users may contest revocation within fifteen business days, suspending the effective revocation date until dispute resolution Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet). Revocation is precluded by force majeure; lack of funds, absence of required goods in the market, or administrative penalties do not constitute force majeure Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet).

List of Sources
- Articles 210–221 of the Code "On Subsoil and Subsoil Use" (adilet)

政策能查出处,落地找人对接,详情问 tumah.kz
Policies can be traced to their sources, implementation contacts can be arranged — ask tumah.kz for details

Ask a question Every answer cites its source; if we cannot answer, a person replies within 24 hours.